You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Simpang Susun Semanggi Dimulai

Semanggi Interchange Project Begins

Jakarta Governor, Basuki T Purnama does a groundbreaking of Semanggi Interchange today, Friday (4/8). It is done to parse traffic congestion in Semanggi area.

This interchange is along 80 meters on Semanggi

"By saying thanksgiving, Semanggi interchange project begins," he stated, during groundbreaking in Semanggi, South Jakarta, Friday (4/8).

He disclosed, the project is monumental because it is a civil milestone in Indonesian. Because this is the longest interchange over the highway in full precast arch.

Heavy Equipment Prepared at Semanggi Flyover Groundbreaking Site

"This interchange is along 80 meters on Semanggi," he disclosed.

Jakarta Bina Marga Dept Head, Yusmada Faisal added, there are two interchanges that will be build. They are from Grogol-Blok M as long as 796 meters, and Polda-Monas as long as 826 meters. It is hoped the project could parse congestion in Semanggi.

"With two ramps, there is no longer a vehicle that intersect in the region. Hopefully, the vehicle can have each lane in the upcoming 2017," he hoped.

Project fund is from obligation of Japanese subsidiary company, Mori Company (PT Mitra Panca Persada). Its amount reached Rp 360 billion, with details physical project Rp 345 billion and Rp 15 billion for consultant cost. While the contractor that will do the construction, PT Wijaya Karya (Wika).

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1127 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing